The Electrical Toolbox is a suite of 34 BS 7671 calculation tools built for electrical engineers, contractors and inspectors. From adiabatic calculations and cable sizing to ring final circuit verification, motor starting analysis, conduit fill, power factor correction and energy cost estimation - every calculation you reach for on the job, available instantly and for free.
Electricians and electrical engineers spend too much time hunting through separate online calculators, recreating spreadsheet formulas, and cross-referencing BS 7671 tables. The Electrical Toolbox gives you one consistent place for every BS 7671 calculation you need - no setup, no cost.
The Electrical Toolbox is designed to be useful from the moment you log in. No configuration. No data to import. Just open the tool you need and get your answer.
Register in under a minute through the Construct Software ID system. Your account gives you immediate access to all 34 tools - no credit card, no trial period, no catch.
Pick from 34 purpose-built calculation tools covering adiabatic equations, cable sizing, maximum Zs lookup, voltage drop, demand & diversity, ring final circuit verification, motor starting, conduit fill, power factor correction, energy costing and more.
Each tool has a clean, engineer-friendly interface. Enter your known values and the result is calculated instantly - with full BS 7671 references throughout.
Calculate the absolute minimum permitted circuit protective conductor size, or verify an existing protective conductor is adequately sized.
Find the minimum cable size for a circuit from BS 7671 Appendix 4, applying ambient, grouping and thermal insulation factors, and check voltage drop, earth fault loop impedance (Zs) and the protective conductor thermal limit.
Estimate the maximum demand of an installation from its connected load, applying the IET On-Site Guide diversity allowances for the type of premises and circuit.
Convert to or from kVA, Voltage and Amps (Single Phase & Three Phase) or convert to or from kVA, Power Factor and kW.
Look up the maximum earth fault loop impedance where an RCD provides fault protection (BS 7671 Table 41.5), and check a measured value.
Look up the maximum Zs for circuit-breakers and fuses on reduced low voltage systems (Uo 55 V and 63.5 V), with 0.8 x values for comparison with measured readings.
Calculate to and from Voltage, Current, Resistance and Power.
Calculate PEFC, PSCC and the Ipf to record from loop impedances or an instrument reading, including the three-phase estimate.
Calculate Zs from Ze and R1+R2, or either of those from the other two, with an optional check of a measured Zs against the maximum for the protective device.
Calculate cable voltage drop from the BS 7671 Appendix 4 mV/A/m values for single-phase and three-phase circuits, and check it against the limits for public and private supplies.
Convert to or from Watts, Amps and Volts (Single Phase) or kW, Amps and Power Factor (Three Phase).
Calculate how long a fault current can flow before the live conductors reach their limiting temperature (BS 7671 Table 43.1), and check a protective device disconnection time against it.
Calculate the minimum circuit protective conductor size from the line conductor size (BS 7671 Table 54.7), including CPCs of a different material or insulation to the line conductor.
Size the earthing conductor and main protective bonding conductors for the supply earthing arrangement, including PME supplies (BS 7671 Tables 54.1, 54.7 and 54.8).
Estimate the CPC resistance (r2) from a measured line conductor resistance (r1) and the conductor sizes, and the resulting R1+R2 for radial and ring final circuits.
Convert maximum Zs values from older editions of BS 7671 (16th and 17th Edition) to the current basis, applying the Cmin voltage factor, and compare with the current tables.
Look up the maximum Zs for circuit-breakers and fuses (BS 7671 Tables 41.2 to 41.4) at 0.4 s and 5 s, with 0.8 x values for comparison with measured readings.
Convert end-to-end r1, r2 and rn readings to R1+R2 for ring final and radial circuits, with ring continuity checks and values corrected to conductor operating temperature.
Look up the tabulated current-carrying capacity of a cable from BS 7671 Appendix 4, and apply ambient temperature, grouping and thermal insulation factors to find its installed rating.
Verify a ring final circuit — calculate Zs at the worst-case mid-point using the ring formula and check compliance with the maximum permitted Zs for the protective device.
Calculate the maximum permitted circuit length for a given cable type, size, and protective device before the voltage drop limit or maximum Zs limit is exceeded.
Calculate the capacitor bank size (kVAr) required to correct power factor from an existing value to a desired target value.
Calculate full-load current, starting current and starting kVA for single-phase and three-phase motors with direct-on-line, star-delta, soft-start, auto-transformer and VFD starting.
Calculate the maximum earth electrode resistance for a TT installation protected by an RCD, and check that the touch voltage stays within 50 V (BS 7671 Reg 411.5.3).
Calculate the maximum and minimum earth fault or short-circuit current at the far end of a cable run from the fault current at its origin, the cable type, size and length.
Check whether a mix of single-core cables will fit in a conduit or trunking, using the cable factor method of the IET On-Site Guide Appendix E.
Check whether a measured insulation resistance value meets the minimum requirements of BS 7671 Table 64 for the relevant circuit type and test voltage.
Calculate the energy consumption and running cost for an electrical load given its power rating, operating hours, and electricity unit rate.
Calculate conductor resistance and R1+R2 from first principles using resistivity and temperature coefficients — useful for non-standard cables not in the BS 7671 tables.
Look up the meaning of IP (Ingress Protection) rating codes for solid particle and liquid ingress protection, with the minimum IP ratings BS 7671 requires in special locations such as bathrooms and swimming pools.
Look up the old (pre-2004) and current harmonised cable identification colours for single-phase, three-phase and DC systems, and when a warning notice is needed for mixed colours.
Calculate the prospective short-circuit current at the secondary terminals of a transformer from its kVA rating, percentage impedance, and secondary voltage.
Calculate the voltage unbalance of a three-phase supply from the three line-to-line voltages, as defined in EN 50160, and check it against the 2% limit.
An indicative check of whether two series-connected protective devices will discriminate, using recognised simple rules. Confirm with the manufacturers' selectivity data.
A tour of the key screens - from cable sizing and voltage drop to maximum Zs, adiabatic checks and ring final circuit verification.
The Electrical Toolbox covers the calculations that come up day-to-day across the full breadth of electrical contracting and engineering work.
Quickly check cable sizing, calculate adiabatic minimums, confirm voltage drop compliance and verify Zs against maximum permitted values during design – without switching between separate tools or BS 7671 appendices.
On-site and design calculations for Zs / Ze / R1+R2, ring final circuit verification, insulation resistance checks, temperature correction of measured values, fault current analysis, conduit fill and discrimination checking – all available from any browser without installing anything.
The Electrical Toolbox sits alongside a growing suite of Construct Software products covering cable calculation, test and certification, compliance management, facilities management and more - all built specifically for the electrical contracting industry.
Compliance management for PAT testing, Minor Works, EICRs and distribution board documentation
BS 7671 cable calculation for single circuits and multi-circuit projects with full project reports
BS 7671 test & certification - EICs, EICRs, Minor Works certificates with PDF generation
Contractor insurance, accreditation and competency management for procurement teams
Full-stack FM platform for PPM, assets, reactive jobs and compliance documentation
Structured electrical interim inspection reports and checklists
BS 7909 temporary electrical system certification for events and media installations
The Construct Software suite continues to grow with new specialist tools for the electrical industry
Learn more at our About page or visit constructsoftware.co.uk.
Everything you need to know before getting started.
Create your free account and get instant access to 34 BS 7671 calculation tools - no installation, no subscription, no catch.